Pipetech were tasked to AquaMill® a blocked 3 1⁄2” diameter drill pipe that had been blocked with set cement. Total length of blockage was 10 meters.
The blocked pipe was set up on a purpose built cradle and using 1⁄2” Aqua Milling® the line was Aqua Milled utilizing a stepped cutting nozzle. The pipe was Aqua Milled until the total length had a clear route through the blockage. An aggressive polishing nozzle was then used to remove any residual blockage from the internal pipe wall. All waste material was collected from the entry point to specific holding tanks.
Challenges
Removal of heavy set cement which proved difficult for traditional pipe-cleaning techniques.
Achievements
Successful unblocking, cleaning and containment of cement from drill pipe.
All works completed without incident, maintaining Pipetech’s zero LTI record.
Benefits
Performance – Fully contained remotely operated cleaning system carried out cleaning of difficult pipe work were other methods had failed.